The project for the construction of solar panels, for renewable energy, includes electrical equipment (sockets, flexible pipes, modular boxes, pipe extensions, and other electrical parts), inverters, protective devices, solar panels, and electrical assembly work.
The impact on the environment is welcome in the region and especially in Kosovo that 90% of local electricity production is from coal.
The optimal solar system at the peak of the building with an installed power of 99.90 kWp consisting of 222 solar panels, each with rated power 450 W, and under the assumption of 80% system efficiency, has the potential to generate 106,168 kWh/year.